FAQs
- Skate bowls x2 various depths
- Plaza style skating concourse
- Parkour activity elements
- New children’s playground
- Half Basketball court
- Shaded rest and social areas
- Lawn areas
- New pathway network
- Fencing
- New parking arrangements along Wandella Road
- Lighting and electrical requirements
- Reconfiguration of some netball courts
- The children’s playground will be removed
- Several sports field will be impacted during construction. Council Sport Services will work closely with the impacted sporting clubs about construction impacts.
- 7.00 am – 5.00 pm Monday to Friday
- 8.00 am - 3.00 pm Saturdays, and
- none on Public Holidays.
Why was Seymour Shaw selected for the new Youth Precinct and Open Space Upgrade?
Community and Council were aware of demand for an active sports and youth facility in a centrally accessible area of Sutherland Shire.
Council secured grant funding from NSW State Government through the Department of Planning and Environment Planning Public Park Legacy Program to fund a public open space amenity for the benefit of the community.
Representatives from the local community, home-ground sports clubs, tennis, RSL and potential users from the skating community worked through 2021 to develop the Masterplan which was adopted by Council in November 2021.
Council contributed additional resources and funding to the planning, design, and construction of the Youth Precinct and Open Space Upgrade.
What will be built in the Youth Precinct and Open Space Upgrade?
Council (with the support of NSW Government) are constructing a regional level active sports and youth space, and stage one will include:
The Youth Precinct and Open Space Upgrade works will cost approximately $5.72 million.
What facilities will not be available during the construction period?
During construction, the existing internal carpark (30 spaces) and Wandella Road roadside parking (27 spaces) will be removed.
A new parking area will be built in Wandella Road providing 55 spaces, this will take about 4 months to complete.
Parking located north of the Netball control room will remain unchanged.
When construction commences:
Where will the Youth Precinct and Open Space Upgrade be located in Seymour Shaw Park?
The area identified in the Masterplan for the Youth Precinct is west of the tennis courts. The existing internal car parking will be removed, and these car spaces will be replaced in the new car park layout along Wandella Road.
The Youth precinct will cover an area of approx. 3,700 sq. metres and the space of two netball courts will be used.
In Seymour Shaw Park Stage 2 (design 2022/23 constructed 2023/24) all netball courts will be realigned, relevelled and have the required and standardised run-out areas.
Will the existing public toilets be available throughout construction?
Yes the existing toilet will remain open during construction of the Youth Precinct.
The toilets will be replaced as part of Stage 2 works and relocated along the western side of the tennis courts.
When is construction of the Youth Precinct and Open Space Upgrade going to start and finish ?
Construction is expected to start early 2023 and to be completed by 30 June 2023.
Note: During construction, noise associated with demolition and construction (including machinery) will be limited to:
Will weekend sports continue or change ?
During the construction of Stage 1 Active Sports Precinct, all sports currently timetabled for early 2023 will not be disrupted.
Council’s Sports Services Team will consult directly with Miranda Magpies and Sutherland Shire Netball associations regarding the reduced number of courts.
Will the Youth Precinct and Open Space Upgrade be fenced?
Fencing will be installed around the skate bowls to limit unintentional access, sports fencing will be installed along the east west pathway to stop flyballs entering the Youth Precinct.